Coordinator - Handover (Cooma, Australia)
Webuild Group
Cooma, New South Wales, Australia Remote
The Future Generation Joint Venture brings together the combined engineering experience and expertise of WeBuild, Clough and Lane and has been selected to design construct Snowy 2.0. This project is based within the Snowy Mountains in NSW and will deliver one of the largest pumped hydro schemes in the world.
Snowy 2.0 is the next chapter in the Snowy Scheme's history. It is the largest committed renewable energy project in Australia and will provide on-demand energy and large-scale storage for many generations to come. This Iconic Project has and will continue to create its own legacy in Australian history.
Purpose of the Role:
To develop, implement and improve the Snowy 2.0 project and handover management system for the current works.
|
Qualifications:
Tertiary Construction Management Qualifications or related discipline
White Card
Experience:
A minimum of 6 years professional experience in the management of completion and handover on complex infrastructure projects.
Senior level management experience working on large scale projects (Oil and Gas, Mining, Infrastructure)
Expert experience and knowledge in multiple EDMS systems.
Experience using completion systems
Experience in managing document and data handover.
|
Required Competencies:
Quality management system audit qualification
Understanding ISO AS/NZS 9001 requirements
Working knowledge of EDMS systems
Sound problem-solving skills
Strong Initiative and proactive nature
Key collaborative skills
Strong stakeholder management skills across different levels
Exceptional written and verbal communication skills
Well-developed time management skills
High attention to detail
Exceptional knowledge and ability in the use of the Microsoft Office Suite, including Word, Excel, Outlook and PowerPoint
|
Core Accountabilities and Responsibilities:
Regular meetings are scheduled to coordinate completion activities
Completion progress is reported in the monthly Project reports when project reaches appropriate stage
A Handover Documentation schedule is prepared and agreed with SHL
Articulate the completion methodology
Ensure all documents required for handover are at As-Built Status
Asset handover requirements are documented and met
Processes are developed to manage Defect Correction Period (DCP)
Construction Completion and handover requirements are outlined
Final completion (post DCP) requirements are outlined
Operations and Maintenance (O&M) Manuals are generated for handover to SHL
The timing and process for submission of documentation to SHL is documented
Completion and submission of all Handover Documentation to SHL
Liaise with the design team on design issues.
Establishing a strong and open relationship with Principal Representative and IC representatives concerning matters of quality and compliance specifically regarding handover of the documents and Data.
The above listed authorities & responsibilities are only a guide and may change as directed by your Manager/Supervisor or as per the requirements of FGJV Management.
|
As an employee you will be eligible to participate in a number of additionalemployee benefits. This includes:
Competitive Salary
The FGJV Retention Bonus Scheme
Employee Assistance Program (EAP)
Paid Parental Leave
Qantas Club Membership discounts
Professional Development
These positions are in remote challenging areas with extreme cold temperatures which need to be considered before applying for these roles.
If you meet the above requirements and would like to work on this iconic project, please apply now.
Project Overview: Snowy 2.0 Project Promotional Video - YouTube